fss-mini-rag-github/development-compliance-research/building_codes_safety_standards.md
fss-code-server 5ed6b6cb5f
Some checks failed
Build and Release / Build wheels on macos-13 (pull_request) Has been cancelled
Build and Release / Build wheels on macos-14 (pull_request) Has been cancelled
Build and Release / Build wheels on ubuntu-latest (pull_request) Has been cancelled
Build and Release / Build wheels on windows-latest (pull_request) Has been cancelled
Build and Release / Build zipapp (.pyz) (pull_request) Has been cancelled
CI/CD Pipeline / test (ubuntu-latest, 3.10) (pull_request) Has been cancelled
CI/CD Pipeline / test (ubuntu-latest, 3.11) (pull_request) Has been cancelled
CI/CD Pipeline / test (ubuntu-latest, 3.12) (pull_request) Has been cancelled
CI/CD Pipeline / test (windows-latest, 3.10) (pull_request) Has been cancelled
CI/CD Pipeline / test (windows-latest, 3.11) (pull_request) Has been cancelled
CI/CD Pipeline / test (windows-latest, 3.12) (pull_request) Has been cancelled
CI/CD Pipeline / security-scan (pull_request) Has been cancelled
CI/CD Pipeline / auto-update-check (pull_request) Has been cancelled
Build and Release / Test installation methods (macos-latest, 3.11) (pull_request) Has been cancelled
Build and Release / Test installation methods (macos-latest, 3.12) (pull_request) Has been cancelled
Build and Release / Test installation methods (ubuntu-latest, 3.11) (pull_request) Has been cancelled
Build and Release / Test installation methods (ubuntu-latest, 3.12) (pull_request) Has been cancelled
Build and Release / Test installation methods (ubuntu-latest, 3.8) (pull_request) Has been cancelled
Build and Release / Test installation methods (windows-latest, 3.11) (pull_request) Has been cancelled
Build and Release / Test installation methods (windows-latest, 3.12) (pull_request) Has been cancelled
Build and Release / Publish to PyPI (pull_request) Has been cancelled
Build and Release / Create GitHub Release (pull_request) Has been cancelled
Agent Test Results: Real Estate Development - Zoning Analysis
- Tested FSS-Mini-RAG with real estate development documentation
- Created intelligent knowledge base for domain queries
- Evaluated search effectiveness for professional workflows
- Documented 2 critical issues found
- Rating: 7/10 overall effectiveness

🤖 Generated with [Claude Code](https://claude.ai/code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-09-08 16:09:00 +00:00

6.4 KiB

Building Codes and Safety Standards

Mixed-Use Development Requirements

International Building Code Compliance

Occupancy Classification

Mixed-use buildings must comply with:

  • Group R-2: Residential occupancies (apartments/condos)
  • Group M: Mercantile occupancies (retail spaces)
  • Group B: Business occupancies (offices)
  • Group A: Assembly occupancies (if restaurants >50 occupants)

Construction Type Requirements

Based on height and area:

  • Type I or II construction: Buildings over 4 stories
  • Type III construction: Allowed for buildings 3-4 stories with sprinklers
  • Fire-resistive ratings: Minimum 2-hour between residential and commercial
  • Shaft protection: 2-hour fire rating for all vertical penetrations

Life Safety and Egress Requirements

Exit Requirements

Residential Components:

  • Maximum travel distance to exit: 200 feet (sprinklered), 125 feet (non-sprinklered)
  • Minimum two exits required for floors >500 sq ft or >10 occupants
  • Exit width: Minimum 44 inches for residential corridors
  • Maximum dead-end corridor: 35 feet

Commercial Components:

  • Maximum travel distance: 250 feet (sprinklered), 200 feet (non-sprinklered)
  • Exit capacity: 0.2 inches per occupant for level egress, 0.3 inches for stairs
  • Minimum exit door width: 32 inches clear
  • Emergency lighting: 90-minute battery backup required

Stairway Requirements

  • Minimum width: 44 inches between handrails
  • Maximum rise: 7 inches, minimum run: 11 inches
  • Handrail height: 34-38 inches above tread nosing
  • Intermediate landings: Required for rise >12 feet
  • Pressurized stairwells: Required in buildings >75 feet

Fire Protection Systems

Automatic Sprinkler Systems

Required for:

  • All buildings over 3 stories
  • Residential buildings with >16 units per floor
  • Commercial spaces >12,000 sq ft
  • Assembly occupancies >300 occupants

System Design Standards:

  • Residential areas: NFPA 13R or 13D systems
  • Commercial areas: NFPA 13 wet pipe systems
  • Water supply: 2-hour demand plus 500 GPM hose stream
  • Fire department connection: Required on street side

Fire Alarm and Detection

Required Components:

  • Addressable fire alarm system throughout building
  • Smoke detection in all sleeping rooms and corridors
  • Heat detection in mechanical rooms and storage areas
  • Carbon monoxide detection in residential units with attached garages
  • Voice evacuation system in buildings >3 stories

Accessibility Requirements (ADA Compliance)

General Accessibility

  • Accessible route: From parking to all public and common areas
  • Elevator access: Required for buildings >3 stories or 3,000 sq ft per floor
  • Door requirements: 32-inch minimum clear width, maximum 5 lb opening force
  • Ramp specifications: Maximum 1:12 slope, landings every 30 feet

Residential Accessibility (Fair Housing Act)

  • 5% wheelchair accessible: Fully accessible units
  • 2% hearing/vision impaired: Units with enhanced accessibility features
  • Common areas: All amenity spaces must be accessible
  • Parking: 2% of spaces must be accessible, 1% van-accessible

Commercial Accessibility

  • Customer areas: All retail and restaurant areas fully accessible
  • Work areas: Common use circulation paths accessible
  • Restrooms: Accessible facilities required (1 per floor minimum)
  • Parking: 1 per 25 spaces accessible, plus 1 van space per 6 accessible

Structural Requirements

Seismic Design (varies by region)

  • Seismic Design Category: Determined by ground motion and occupancy
  • Special inspection: Required for structural steel and concrete
  • Nonstructural components: Seismic restraint for mechanical/electrical systems
  • Vertical irregularities: Restricted in high seismic zones

Wind Load Design

  • Basic wind speed: Per ASCE 7 wind maps (typically 90-120 mph)
  • Exposure category: Urban (B), Suburban (C), or Open (D)
  • Wind-borne debris: Impact-resistant glazing in high-wind zones
  • Roof design: Enhanced attachment for membrane roofing systems

Mechanical, Electrical, and Plumbing (MEP)

HVAC Requirements

  • Indoor air quality: ASHRAE 62.1 ventilation rates
  • Energy efficiency: ASHRAE 90.1 or local energy codes
  • Separate systems: Residential and commercial on separate systems
  • Emergency power: Required for life safety systems

Electrical Systems

  • Service capacity: Minimum 100 amps per residential unit
  • Commercial power: 3-phase service for commercial components
  • Emergency systems: Battery backup for exits and fire alarm
  • EV charging: Pre-wiring required for 20% of parking spaces

Plumbing Systems

  • Water supply: Adequate pressure (minimum 15 psi at fixtures)
  • Sewage capacity: Must not exceed municipal system capacity
  • Grease interceptors: Required for commercial kitchen facilities
  • Backflow prevention: Required for all commercial water connections

Energy Code Compliance

Envelope Requirements

  • Insulation values: Minimum R-values per climate zone
  • Window performance: Maximum U-factor and minimum SHGC
  • Air sealing: Maximum 3.0 ACH50 for residential, 0.4 CFM/sq ft for commercial
  • Thermal bridging: Continuous insulation requirements

Lighting and Electrical

  • Lighting power density: Maximum watts per square foot by space type
  • Daylight controls: Required in spaces with >250 watts of general lighting
  • Occupancy sensors: Required in storage, utility, and restroom areas
  • Energy monitoring: Required for buildings >50,000 sq ft

Code Enforcement and Inspection Schedule

Plan Review Process

  1. Structural review: 10-15 business days
  2. MEP review: 10-15 business days
  3. Fire/Life Safety review: 15-20 business days
  4. Accessibility review: 5-10 business days
  5. Corrections cycle: Additional 5-10 days per revision

Construction Inspections

  • Foundation inspection: Before concrete placement
  • Framing inspection: Before concealment of structural elements
  • MEP rough-in: Before concealment of systems
  • Fire-stopping inspection: Before concealment of fire-rated assemblies
  • Final inspection: Before certificate of occupancy

Special Inspections Required

  • Structural steel welding: Continuous inspection
  • Concrete placement: Periodic inspection
  • Fireproofing application: Continuous inspection
  • Fire-stopping installation: Periodic inspection