# Building Codes and Safety Standards ## Mixed-Use Development Requirements ### International Building Code Compliance #### Occupancy Classification **Mixed-use buildings must comply with:** - **Group R-2**: Residential occupancies (apartments/condos) - **Group M**: Mercantile occupancies (retail spaces) - **Group B**: Business occupancies (offices) - **Group A**: Assembly occupancies (if restaurants >50 occupants) #### Construction Type Requirements **Based on height and area:** - **Type I or II construction**: Buildings over 4 stories - **Type III construction**: Allowed for buildings 3-4 stories with sprinklers - **Fire-resistive ratings**: Minimum 2-hour between residential and commercial - **Shaft protection**: 2-hour fire rating for all vertical penetrations ### Life Safety and Egress Requirements #### Exit Requirements **Residential Components:** - Maximum travel distance to exit: 200 feet (sprinklered), 125 feet (non-sprinklered) - Minimum two exits required for floors >500 sq ft or >10 occupants - Exit width: Minimum 44 inches for residential corridors - Maximum dead-end corridor: 35 feet **Commercial Components:** - Maximum travel distance: 250 feet (sprinklered), 200 feet (non-sprinklered) - Exit capacity: 0.2 inches per occupant for level egress, 0.3 inches for stairs - Minimum exit door width: 32 inches clear - Emergency lighting: 90-minute battery backup required #### Stairway Requirements - **Minimum width**: 44 inches between handrails - **Maximum rise**: 7 inches, minimum run: 11 inches - **Handrail height**: 34-38 inches above tread nosing - **Intermediate landings**: Required for rise >12 feet - **Pressurized stairwells**: Required in buildings >75 feet ### Fire Protection Systems #### Automatic Sprinkler Systems **Required for:** - All buildings over 3 stories - Residential buildings with >16 units per floor - Commercial spaces >12,000 sq ft - Assembly occupancies >300 occupants **System Design Standards:** - **Residential areas**: NFPA 13R or 13D systems - **Commercial areas**: NFPA 13 wet pipe systems - **Water supply**: 2-hour demand plus 500 GPM hose stream - **Fire department connection**: Required on street side #### Fire Alarm and Detection **Required Components:** - Addressable fire alarm system throughout building - Smoke detection in all sleeping rooms and corridors - Heat detection in mechanical rooms and storage areas - Carbon monoxide detection in residential units with attached garages - Voice evacuation system in buildings >3 stories ### Accessibility Requirements (ADA Compliance) #### General Accessibility - **Accessible route**: From parking to all public and common areas - **Elevator access**: Required for buildings >3 stories or 3,000 sq ft per floor - **Door requirements**: 32-inch minimum clear width, maximum 5 lb opening force - **Ramp specifications**: Maximum 1:12 slope, landings every 30 feet #### Residential Accessibility (Fair Housing Act) - **5% wheelchair accessible**: Fully accessible units - **2% hearing/vision impaired**: Units with enhanced accessibility features - **Common areas**: All amenity spaces must be accessible - **Parking**: 2% of spaces must be accessible, 1% van-accessible #### Commercial Accessibility - **Customer areas**: All retail and restaurant areas fully accessible - **Work areas**: Common use circulation paths accessible - **Restrooms**: Accessible facilities required (1 per floor minimum) - **Parking**: 1 per 25 spaces accessible, plus 1 van space per 6 accessible ### Structural Requirements #### Seismic Design (varies by region) - **Seismic Design Category**: Determined by ground motion and occupancy - **Special inspection**: Required for structural steel and concrete - **Nonstructural components**: Seismic restraint for mechanical/electrical systems - **Vertical irregularities**: Restricted in high seismic zones #### Wind Load Design - **Basic wind speed**: Per ASCE 7 wind maps (typically 90-120 mph) - **Exposure category**: Urban (B), Suburban (C), or Open (D) - **Wind-borne debris**: Impact-resistant glazing in high-wind zones - **Roof design**: Enhanced attachment for membrane roofing systems ### Mechanical, Electrical, and Plumbing (MEP) #### HVAC Requirements - **Indoor air quality**: ASHRAE 62.1 ventilation rates - **Energy efficiency**: ASHRAE 90.1 or local energy codes - **Separate systems**: Residential and commercial on separate systems - **Emergency power**: Required for life safety systems #### Electrical Systems - **Service capacity**: Minimum 100 amps per residential unit - **Commercial power**: 3-phase service for commercial components - **Emergency systems**: Battery backup for exits and fire alarm - **EV charging**: Pre-wiring required for 20% of parking spaces #### Plumbing Systems - **Water supply**: Adequate pressure (minimum 15 psi at fixtures) - **Sewage capacity**: Must not exceed municipal system capacity - **Grease interceptors**: Required for commercial kitchen facilities - **Backflow prevention**: Required for all commercial water connections ### Energy Code Compliance #### Envelope Requirements - **Insulation values**: Minimum R-values per climate zone - **Window performance**: Maximum U-factor and minimum SHGC - **Air sealing**: Maximum 3.0 ACH50 for residential, 0.4 CFM/sq ft for commercial - **Thermal bridging**: Continuous insulation requirements #### Lighting and Electrical - **Lighting power density**: Maximum watts per square foot by space type - **Daylight controls**: Required in spaces with >250 watts of general lighting - **Occupancy sensors**: Required in storage, utility, and restroom areas - **Energy monitoring**: Required for buildings >50,000 sq ft ### Code Enforcement and Inspection Schedule #### Plan Review Process 1. **Structural review**: 10-15 business days 2. **MEP review**: 10-15 business days 3. **Fire/Life Safety review**: 15-20 business days 4. **Accessibility review**: 5-10 business days 5. **Corrections cycle**: Additional 5-10 days per revision #### Construction Inspections - **Foundation inspection**: Before concrete placement - **Framing inspection**: Before concealment of structural elements - **MEP rough-in**: Before concealment of systems - **Fire-stopping inspection**: Before concealment of fire-rated assemblies - **Final inspection**: Before certificate of occupancy #### Special Inspections Required - **Structural steel welding**: Continuous inspection - **Concrete placement**: Periodic inspection - **Fireproofing application**: Continuous inspection - **Fire-stopping installation**: Periodic inspection